Home › Free tools › Meet schedule builder

Free tool for meet organizers

Speed skating meet schedule builder

List the events, the entries and the time each heat takes. The builder works out how many heats there are, adds ice resurfacing and breaks, and gives a timed running order.

Build the running order

TypeEvent or breakEntriesPer heatMin per heat

-

StartEventHeatsTakes

The schedule stays on this device. Nothing is sent to uManageClub.

How the schedule is worked out

A meet is a long list of races, and the clock is the hard part. How many heats does an event need, how long will they take, and when does the afternoon end? The builder answers with simple maths. The number of heats is the number of entries divided by the number of skaters per heat, rounded up. The time an event takes is the number of heats multiplied by the minutes each heat takes, including the walk on and the start.

Events run in the order you list them. Every time the heat count reaches the number you set, the builder adds an ice resurfacing break. You can add your own breaks too, such as lunch or the awards. The start time of every line comes from the one before it, so moving an event up or down updates the whole day.

A worked example

A club hosts a one-day meet starting at 9:00 am. The 500 m for girls has 12 entries with four per heat, so it needs three heats at three minutes each, nine minutes in all. The boys' 500 m has 14 entries and needs four heats, twelve minutes. Together that is seven heats, so the first resurfacing break is not due yet. After the two 1000 m events the builder passes twelve heats, adds a 15 minute resurfacing and carries on. With a 30 minute lunch break and the later events, the example has 16 heats and finishes at about 10:46 am. A real meet has many more events, but the method is the same.

Tips for building a realistic schedule

This is a planning tool for a simple running order. Seeding, relay rules and lane or start-position draws are set by your association, and the meet's official program decides the real order.

Questions

How do I work out the number of heats?

Divide the entries by the number of skaters per heat and round up. For example, 14 entries with four per heat is 3.5, which rounds up to four heats.

Does it add ice resurfacing?

Yes. Set how many heats are skated between resurfacing and how long it takes, and the builder adds a break whenever that number is reached.

Can I add lunch or an awards break?

Yes. Use Add a break and set the minutes. You can move it anywhere in the order.

Can I export or print the schedule?

Yes. Print schedule gives a clean sheet, Download CSV opens in a spreadsheet and Copy table pastes into a bulletin or message.

Does it seed skaters into heats?

No. It works out the timing only. Seeding and heat draws follow your association's rules.

Do this automatically for your whole club

uManageClub is a free club app for up to 3 groups: schedules, meets and RSVPs, bench duty, race results, racing ages and notifications. Families join with one club code, with no account and no password.

Start your club - free →

Last updated 2026-11-20.